1. 尊龙凯时

          Other Applications
          Modular and streamlined installation. Optimized for off grid battery energy storage systems to reduce electricity bills.
          Smart design with an optimized and cost-efficient solution
          Flexible warranty package
          Grid-forming inverter
          EMS (Energy Management System) – controlling diesel and battery dispatch
          Seamlessly integrated renewables
          Site resiliency
          Tier 1 hardware and software
          Trustworthy, expert partner network and strong supply chain
          Flexible solutions designed for each customer’s needs
          Off-grid and grid-connected Microgrids

          Industrial power supply is independent from oil price

          Increasing RE penetration and sustainability

          · Ramp-up control for diesel allows the switching off of diesel generators in times of renewable energy generation

          Site resiliency

          Hedging against possible emission penalties

          Green and sustainable power supply

          Overcome planned and unplanned power outages

          Microgrid
          Grid forming Power Conversion System (PCS) allows the power supply by only Battery, Battery+PV or both in parallel with Diesel
          Ramp-rate control allows Diesel to be turned off in times of high renewable penetration and to be switched on when needed
          Dispatch strategy controlled by advanced Energy Management System (EMS)
          Large Industrial

          Demand response

          Site resiliency

          Lower demand charges

          Potential addition of PV

          Smart design with an optimized and cost-efficient solution

          Tier 1 hardware and software

          Trustworthy, expert partner network and strong supply chain

          Flexible solutions designed for each customer’s needs

          Peak Power Shaving with or without solar

          Energy bills for industrial consumers based on the highest power demands
          · Substantial reduction of energy payments by absorbing peak power demands

          Delivery of stored energy to the grid during periods of high demand
          · Lower burden placed on the distribution network
          · Increased network efficiency

          Energy to be stored in periods of low demand

          Balanced energy generation as a result
          · Avoids more expensive and polluting generators

          Large Industrial
          Battery is being charged from the grid in times of lower load consumption
          When load consumption increases, battery can supply power to the load in order to limit power consumption from grid
          Start your Storage Journey
          Discover how Trina Storage can help you!
          Get in touch with us